/  Power System Blackouts (Cause and Preventive Measures)
Pay Attention Please ! The course location "Taksim Square" is subject to availability . We may change the course location if there is no availability and we will let you know about the location changing directly if it changes. The exact course time will be clear before one week prior to course start date.
BMC Training provides on 4 Nov 2018 Power System Blackouts (Cause and Preventive Measures) course [Electrical and Power Engineering Training] in Istanbul,Turkey

Course Description

Major blackouts are caused by failing to conduct rigorous long term planning studies of the electrical system; and neglect to conduct appropriate multiple contingency or extreme condition assessment. Also the lack of sufficient voltage analysis and use of operational voltage criteria that do not reflect actual voltage stability conditions and needs can lead to catastrophic blackouts. Reliability requirements and standards must be followed during the system operation. The security of the transmission system must be ensured under all conditions. Usually major blackout can result in major loss of revenue, business interruptions, communication interruptions, security and bad quality of supply.

Course Objective

To provide electric system planners, designers and operators with concepts, tools and methodologies essential to address modern-day issues of competition, open access, wheeling and new technology in system planning
How to improve the quality of supply in A.C power system
Necessary steps to prevent cascading blackouts

Course Outline

Blackout causes overview

  • Voltage instability initiating blackouts
  • Induction motors role in triggering blackout
  • Cold rush current effects on blackout
  • Blackout prevention by general & network voltage control
  • Blackout prevention by loads voltage stabilization
  • Example

Blackout preventive measures

  • How and why the blackout begin
  • Causes of the blackout and violations of standards.
  • Under-frequency and under-voltage load shedding
  • Example

Planning criteria and reliable operation of power grid

  • Reliability organizations
  • Key parties in the pre-cascade phase
  • Review of international practice
  • Representing reliability measures and customer costs
  • Application examples (U.S and Jordan Blackout)
  • Contingency analysis
  • Ranking and screening methods
  • Defining a study area
  • Handling divergence, islanding, relying events
  • Measuring customer impact
Transfer limit analysis
  • Thermal and voltage limits
  • Defining transfer conditions
  • PV curses for normal and contingency condition
  • Transient stability



Related Training Courses

Course Details
  • Code EPE54
  • Start 09:00 AM - Nov 4 2018
  • END    12:30 PM - Nov 8 2018
  • Istanbul , Taksim Square
  • +44 2087206971
  • Training@bmc.net

Fees Per Person

4950 GBP + VAT
Register Now Send an Enquiry Download PDF Brochure Other Dates

Courses Search

Recent Posts

Connect with us

IFRS Preparation. (5 Days)Available in London - Dubai - Istanbul - Kuala Lumpur

Join our Civil and Construction Engineering Training Courses , Electrical and Power Engineering Training Courses and Facilities Management Training

Technical Training Courses

Newsletter