Introduction to Outside Plant Design Training Course in Kuala Lumpur

BMC Training provides Introduction to Outside Plant Design Course in Kuala Lumpur.There are 10 sessions for the course Introduction to Outside Plant Design in Kuala Lumpur , Malaysia.

Introduction to Outside Plant Design Training in Kuala Lumpur , Malaysia

Course Address : Westin Kuala Lumpur Hotel - Course Fees : 4950 GBP

City Start Date End Date View
Kuala Lumpur , Malaysia 8 - 10 - 2023 12 - 10 - 2023
Details
Kuala Lumpur , Malaysia 12 - 11 - 2023 16 - 11 - 2023
Details
Kuala Lumpur , Malaysia 19 - 11 - 2023 23 - 11 - 2023
Details
Kuala Lumpur , Malaysia 3 - 12 - 2023 7 - 12 - 2023
Details
Kuala Lumpur , Malaysia 7 - 1 - 2024 11 - 1 - 2024
Details
Kuala Lumpur , Malaysia 28 - 1 - 2024 1 - 2 - 2024
Details
Kuala Lumpur , Malaysia 4 - 2 - 2024 8 - 2 - 2024
Details
Kuala Lumpur , Malaysia 17 - 3 - 2024 21 - 3 - 2024
Details
Kuala Lumpur , Malaysia 24 - 3 - 2024 28 - 3 - 2024
Details
Kuala Lumpur , Malaysia 21 - 4 - 2024 25 - 4 - 2024
Details

The course outlines of Introduction to Outside Plant Design Training in Kuala Lumpur

Learners can take their existing network cabling knowledge and skills to the next level by gaining a valuable insight into external fibre network distribution strategies, infrastructure components and installation methods. Passive Optical Networking (PON) features heavily as the primary delivery technology for fibre broadband to the home. Methods used for distribution will also feature, exploring the benefits and rationale behind the choice to distribute services underground or overhead.

The duration of this program is five days; the content is comprehensive and detailed allowing network infrastructure professionals to have the potential to add real value to their skills by including these complex areas in their product/service portfolio. A COPT will be undaunted when dealing with complex external fibre networks, able to rationalise the network structure and understand the functions of installed components.

Outlines:

Role of the COPT

  • Planning external plant
  • Construction of external pathways
  • Working in the OSP environment

Regulations, Standards, Codes and Industry Best Practices 

  • Applicable BSEN Standards
  • New Roads and Streetworks Act 1991
  • Working in Confined Spaces
  • Working at height

Fundamentals of Outside Plant Pathways Under-ground 

  • Route planning
  • Pit and chamber construction
  • Ducts and sub-ducts
  • Building entry methods
  • Blown fibre tubing
  • Pathway security
  • Installation methods

Fundamentals of Outside Plant Pathways Overhead 

  • Route planning
  • Telegraph poles and other support structures 
  • Route stability
  • Environmental clearances
  • Wayleaves and pole sharing
  • Pole route construction
  • Installation practices

Passive Optical Networks 

  • Types; GPON, EPON, GEPON 
  • Wavelengths and bandwidth 
  • PON architecture
  • PON components 
  • PON distribution methods

Testing External Fibre Optic Networks 

  • Tier 1 and Tier 2 testing requirements in the OSP environment 
  • Effects of passive splitters 
  • PON test methodology
  • HD/TDR test functionality

Fibre To The Everything (FTTx) 

  • Fibre to the node
  • Fibre to the curb
  • Fibre to the building
  • Fibre to the antenna
  • Fibre to the home